Plan Review
We verify control, check dimensions against the plat, and flag conflicts early.
Service Overview
We stake building corners, column lines, curbs, utilities, and finish grades directly from your construction drawings — each point checked by independent measurement before the crew sees it. When the inspector asks for verification, our cut sheets and as-builts answer.
From single foundations to phased site work, we schedule around your pours and keep a stakeout log the whole job can follow.
What's Included
Process
We verify control, check dimensions against the plat, and flag conflicts early.
Protected benchmarks and baselines established clear of equipment traffic.
Points staked from the model, then independently verified before sign-off.
As-builts captured at each milestone for inspectors and closeout.
Start from accurate existing conditions before the first stake goes in.
ServiceConfirm setbacks from true lines so the building never encroaches.
ProjectSee phased staking across a 120-lot subdivision build-out.
Stakeout crews that mobilize in days, stake to the tenth, and verify before concrete.